SilverLakeLodge
Sunday, December 16, 2012
More of the Basement Door to tunnel is left of the corner
Thursday, December 6, 2012
Footings are complete and the floor above will be 2 feet above the top of the re-bar
That will be a tall basement. --- 16 feeet
Thursday, November 29, 2012
Footings for the new building
Tuesday, November 27, 2012
After Moving the Beaver lodge
Moving the Beaver Lodge
Before the move
Mulching the sticks and logs
Hauling away the mulch and small sticks
Construction begins
Digging Footings
One wall of re-bar up
Heavy duty Re-Bar
Saturday, November 17, 2012
Base rock for the tunnel -- Black tarp covers dome home
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)